loader
×

Blog Details

Raipur Express Highway
Blog 23 Jan 2026 Admin

Raipur Express Highway

The Raipur-Visakhapatnam Expressway (also known as the Raipur-Vizag Economic Corridor) is one of India's most significant ongoing greenfield infrastructure projects. As of January 2026, the project is in its final stages of construction.## Project Overview & Current Status (2026)This 465 km, 6-lane access-controlled highway is part of the Bharatmala Pariyojana and connects Chhattisgarh, Odisha, and Andhra Pradesh.Completion Status: The project is approximately 90-95% complete. While some sections in Chhattisgarh and Andhra Pradesh are nearing total readiness, a few complex stretches in the Odisha ghat sections are still being finalized.Operational Timeline: The expressway is expected to be fully open to the public by December 2026, with several individual packages potentially opening for local traffic by mid-2026.Key Milestone: Chhattisgarh celebrated a major success in late 2025 with the completion of the state's first national highway tunnel (2.8 km) on this corridor, which was finished in record time.## Impact on Travel and EconomyThe highway is designed to transform the logistics and tourism landscape of Central and Eastern India.FeatureBefore ExpresswayWith Expressway (Estimated)Travel Time12–13 Hours5–6 HoursDistance597 km (via NH-26)465 km (Greenfield)Design Speed40–60 km/h (Ghat roads)100 km/h

Great content builds trust, authority, and long-term growth for your business.

Admin
lineLocationsline

Our Branch Locations

Registered Office

Kranthi Arcade, 7-6-17/3, 3rd Floor,
NH-5 Road, Chattivanipalem,
Gajuwaka, Visakhapatnam,
Andhra Pradesh, India.

Corporate Office

Akshara Complex, Flat No. 301,
3rd Floor, Beside Tilak Showroom,
Dwarakanagar, Visakhapatnam,
Andhra Pradesh, India.

Branch Office

Near Over Bridge, Chinnamushidiwada,
Pendurthi, Visakhapatnam,
Andhra Pradesh, India.